Aston and Fincher Hairdressing Supplies

Heating

Aston & Fincher supplies hair and beauty professionals throughout the UK.

The existing Combat CTUA 50 gas fired warm air blower was found to be beyond economic repair. We checked the existing building size and heat loss and found that a smaller heater could be installed so we replaced the defuct appliance with a new CTUA 40. The existing flue and controls were retained.

 

 

Read more

High Bullen Golf Club Spa and Leisure Centre, Devon

Heating

The existing hot water cylinders were in danger of creating serious flooding and the LPG boilers poor condition, We proposed replacement of your central plant room equipment. 

Remove existing boilers , cylinders, pumps ,heating and primary pipework in boiler house. Chemically flush system.

1)      Install 2- 500L stainless steel indirect cylinders complete with temperature controls. (These units may be upgraded at a later date with the addition of an unvented kit to handle high pressure mains or boosted water supplies).

2)      Install 2-Worcester Bosch 40CDI LPG boilers complete with new flues, distribution headers, controls and pumps for 2 heating circuits and 1 hot water circuit.( These 2 circuits shall supply the 2 existing circuits and in the future will supply new circuits. The boilers are large enough to do the entire court yard building which means that in the future the third separate boiler may be removed and system joined to the new plant.

3)      Magna clean filters shall be fitted to protect the new boilers from the old system.

4)      Install Electronic Filling Device and new expansion vessel to meet WRAS regulations.

Read more

Norbord UK Devon

Heating

Manufacturing particleboard, loft flooring panels, Contiboard DIY shelving and flat pack furniture, this South Molton site has led the field in championing sustainable forestry practices. It was the first board manufacturer in the UK to be certified to FSC chain of custody standards and to obtain the environmental management system standard ISO14001.

Optimum and Norbord have run a radiant tube heater replacement program that has run for the past 4 years. Included is a gas line testing, annual service and breakdown contract for all of this site.